Scope of Work
In-Service Welding Installation
24”ANSI300 Hot Tap Line Stop Operation
18”ANSI300 Hot Tap Line Stop Operation
16”ANSI300 Hot Tap Line Stop Operation
Operating Pressure – 420 Psig
PLLEP-RC670 Re-Route Section
Year of Operation
2019
Project
PLLEP-RC670 Re-Route Section
Location
Saraburi
Pipeline Owner
PTT Public Company Limited)
EPC Contractor
Italian Thai Development (ITD) Public Company Limited
Hot Tap Contractor
VES Solution Co.,Ltd
& Spring Hill Consultant Co.,Ltd
Scope of Work
In-Service Welding Installation
18”ANSI300 Hot Tap Line Stop Operation (2 Location)
12”ANSI300 Hot Tap Line Stop Operation (3 Location)
6”ANSI300 Hot Tap Line Stop Operation (6 Location)
4”ANSI300 Hot Tap Line Stop Operation (12 Location)
Operating Pressure – 420 Psig
TD Williamson Asia Pacific Pte.Ltd
VES Solution Co.,Ltd (In-Service Welding Installation)
Scope of Work
24”ANSI900 Hot Tap Line Stop Operation
(Double Position Line Stop)
Operating Pressure – 1250 Psig
BV4.19
Year of Operation
2018
Project
BV4.19 Pig Launcher and Receiver Installation
Location
Saraburi
Pipeline Owner
PTT Public Company Limited)
EPC Contractor
TRC Construction Public Company Limited
Hot Tap Contractor
TD Williamson Asia Pacific Pte.Ltd
VES Solution Co.,Ltd (In-Service Welding Installation)
Scope of Work
36”ANSI600 Hot Tap Line Stop Operation
(2 Position Line Stop – Stopple Train)
With 30” Temporary Bypass
Operating Pressure – 800 Psig
PTT-RA6 GAS MIXING STATION
Year of Operation
2015
Project
PTT-RA6 Gas Mixing Station
Location
Nonthaburi
Pipeline Owner
PTT Public Company Limited)
EPC Contractor
Italian Thai Development (ITD) Public Company Limited
Hot Tap Contractor
VE Solution Co.,Ltd
& Spring Hill Consultant Co.,Ltd
Scope of Work
30”ANSI600 Hot Tap Line Stop Operation
(3 Position Line Stop)
With 24” Temporary Bypass
Operating Pressure – 750 Psig
Suwanaphumi Spring Way
Year of Operation
2008
Project
Natural Gas Pipeline Modification for Suwanaphumi Spring Way
Location
Samutprakarn
Pipeline Owner
PTT Public Company Limited)
EPC Contractor
CH. Karnchang Public Company Limited
Hot Tap Contractor
Vicchi Engineering Co.,Ltd
& Spring Hill Consultant Co.,Ltd
Scope of Work
28”ANSI300 Hot Tap Line Stop Operation
With 24” Temporary Bypass
(2 Position Line Stop – Double Line Stop)
Operating Pressure – 360 Psig
Highway 331#
Year of Operation
2004
Project
Natural Gas Pipeline Modification Re-route (Highway 331#)
Location
Rayong
Pipeline Owner
PTT Public Company Limited)
EPC Contractor
TRC Construction Co.,Ltd
Hot Tap Contractor
Vicchi Engineering &
TD Williamson Asia Pacific Pte.Ltd
Scope of Work
28”ANSI600 Hot Tap Line Stop Operation
Highway 36#
Year of Operation
2004
Project
Natural Gas Pipeline Modification Re-route (Highway 36#)
Location
Chonburi
Pipeline Owner
PTT Public Company Limited)
EPC Contractor
TRC Construction Co.,Ltd
Hot Tap Contractor
Vicchi Engineering &
TD Williamson Asia Pacific Pte.Ltd
Scope of Work
28”ANSI600 Hot Tap Line Stop Operation
Pipeline Modification
Year of Operation
2000
Project
Natural Gas Pipeline Modification at Klong Pravet
Location
Bangkok – Lad Kra Bang
Pipeline Owner
PTT Public Company Limited)
EPC Contractor
TRC Construction Co.,Ltd
Hot Tap Contractor
Vicchi Engineering & IPSCO (International Pipeline Service Company)
Scope of Work
24”ANSI600 Hot Tap Line Stop Operation c/w integrate Bypass
PTT Product Pipeline Re-route
Year of Operation
1999
Project
PTT Product Pipeline Re-route
Location
Chonburi
Pipeline Owner
PTT Public Company Limited)
EPC Contractor
KSS Engineering & Construction Co.,Ltd
Hot Tap Contractor
Vicchi Engineering &
IPSCO (International Pipeline Service Company)
Scope of Work
4”ANSI300 Hot Tap Line Stop Operation (LPG)
8”ANSI300 Hot Tap Line Stop Operation (Propane-Liquid)
10”ANSI300 Hot Tap Line Stop Operation (Natural Gas)
BV#9
Year of Operation
1996
Project
Natural Gas Pipeline Modification at Block valve BV#9
Location
Bang Plee Samutprakarn
Pipeline Owner
PTT Public Company Limited)
EPC Contractor
NKK Engineering (Thailand) Co.,Ltd
Hot Tap Contractor
Vicchi Engineering &
IPSCO (International Pipeline Service Company)
Scope of Work
24”ANSI300 Hot Tap Line Stop Operation
BV#6 and BV#9
Year of Operation
1994
Project
Natural Gas Pipeline Modification at Block Valve BV#6 and BV#9
Location
Bang Pa Kong – Chonburi
Pipeline Owner
PTT Public Company Limited)
EPC Contractor
KSS Engineering & Construction Co.,Ltd
Hot Tap Contractor
Vicchi Engineering &
IPSCO (International Pipeline Service Company)
Scope of Work
28”ANSI600 and 24”ANSI600 Hot Tap Line Stop Operation